Which office do I call for a grading permit near Augusta?
It depends on the county the parcel is in and what you are doing. Augusta-Richmond County uses the Planning and Development Department. Columbia County runs erosion control through its Stormwater Compliance Department. Georgia law sits over both, and a pond adds federal and state water rules on top.
Use the tool below to sort it out, then read the details for your office. Ordinance numbers here are the sections we confirmed. Rules and phone numbers change, so we confirm with the office on each job.
What does Augusta ask for?
Augusta's grading rules sit in Title 7 of its code. We reviewed the 2011 text of the ordinance, so treat the section numbers as a map and the office as the authority.
| Who issues it | Planning and Development, 535 Telfair Street, Suite 300, (706) 821-1796 (Sec. 7-3-43(a)). |
|---|---|
| One per site | Each site needs its own permit. |
| House on a lot | An individual plot plan goes to License and Inspections before a building permit or certificate of occupancy (Sec. 7-3-35(b)(1)). |
| Lot in an approved subdivision | A permit number by phone or in person, with lot and block, subdivision name, address, owner, contractor, and dates. |
| Other ground | A grading plan under Sec. 7-3-44, at a scale no smaller than 1 inch to 100 feet, with a 2-foot contour interval and a registered engineer's seal. |
| Commercial | A site plan plus a grading plan, unless exempt (Sec. 7-3-43(d)). |
| Over 1.1 acres | A soil erosion and sediment control plan (Sec. 7-3-43(e)). |
| Placard | Free after site plan approval, displayed before work starts (Sec. 7-3-45). |
| Pre-construction meeting | Scheduled through Augusta Engineering, (706) 821-1706, after Planning and Development stamps the plans. |
| Appeals | Within 30 days (Sec. 7-3-50). |
What does Columbia County ask for?
Columbia County's Stormwater Compliance Department inspects erosion and sediment control on sites from new houses down to decks, checking against site plans, the county ordinance, and the state's Green Book. Applications for common developments and commercial projects go to Plan Review. New homes, pools, and additions go through Building Standards, or you can email the Stormwater Compliance Department.
- Office. 630 Ronald Reagan Drive, Building A, Evans, GA 30809, (706) 447-7645, Monday through Friday, 8 am to 5 pm.
- Packages. The county accepts complete packages only.
- Inspections. A first erosion inspection for a building permit is requested by 4:30 pm the business day before.
- Flood zones. Structures in a special flood hazard area must sit three feet above the 100-year base flood elevation, and an elevation certificate is required.
What does Georgia require everywhere?
Georgia's erosion and sedimentation law, O.C.G.A. 12-7-7, requires land-disturbing activity to have a permit from the local issuing authority, where the county is certified, or notice to the state under the state general permit where it is not. The local authority collects fees by the acre, can require a bond of up to $3,000 per acre, and can deny an applicant with two or more violations in the prior three years.
The state's field manual defines land-disturbing activity broadly: any land change that may cause soil erosion from water or wind, including clearing, grading, excavating, and filling. Its performance standard is that controls be designed, installed, and maintained for a 25-year, 24-hour rainfall event.
If your county is not certified, there is no individual local permit. The state general permit applies and the state enforces it. We check which situation you are in.
Where does 811 fit?
A permit is not a utility locate. Georgia 811 asks for notice at least two business days before digging, and the member utilities mark their lines. We place that request for the ground we disturb, and the locate marks guide explains the colors.
What extra rules apply near water?
A pond brings in the Army Corps of Engineers (Section 404), Georgia EPD (stream buffer variances), and Georgia's Safe Dams Program, which regulates dams 25 feet or more in height or holding 100 acre-feet or more. The pond page lists the contacts and what the Savannah District's farm pond guide says.
How we handle permits for you
Check the parcel
We confirm the county, the acreage that will be disturbed, and whether the parcel is near a stream or flood zone.
Call the office
We confirm current rules with Planning and Development or Stormwater Compliance and ask what the package needs.
Pull what applies
We prepare and submit the permit and any erosion plan, and keep you informed.
Display and inspect
The placard goes up, erosion controls go in, and we schedule the inspections.